• Jay@lemmy.ca
    link
    fedilink
    English
    arrow-up
    0
    ·
    10 months ago

    n December 2016, under President Barack Obama’s administration, the Corps of Engineers denied an easement for construction of the pipeline under the Missouri River,[13][14][15] though this decision was reversed the following month by the incoming administration of President Donald Trump. The pipeline was completed by April 2017, and its first oil was delivered on May 14.

    https://en.wikipedia.org/wiki/Dakota_Access_Pipeline_protests